ATTENTION ALL EUROPA BUILDERS AND ENTHUSIASTS!
PLANNING A TRIP TO SUN N' FUN THIS YEAR!
During your visit, come to RL AVIATION'S -
Institute of Home Built Aircraft
Technology
RL aviation will be offering three days of extensive Europa Aircraft
Instruction.
In RL aviation's 4500 sq. ft facility located just 20 minutes from Sun n' Fun
you will receive extensive instruction each day.
RL aviation will have several Europas (mono and tri-gear) available for
instruction.
These aircraft are in various stages of their construction.
All three days will give you an excellent "heads up start" on your project.
Whether you are currently building or are considering the purchase of a
Europa this is a fantastic opportunity!
RL aviation is located 20 minutes from Sun n' Fun.
Our instruction seminars are in the afternoon, so that you can attend Sun n'
Fun in the morning.
SCHEDULE
Day 1, Tuesday, April 11th 12 Noon until 6:00 PM
Stage 1--Rudder, Tailplanes, Trim Tabs, Ailerons, Flaps, Hinging, & Alignment
of Tail Planes
Stage 2 --Wing assembly, Wing reinforcement taping, Wing control systems,
Pitot Static, Wing electrical, Fitting & Hinging-ailerons/flaps, Aileron mass
balance boxes, Upper wing skins, & Outrigger assembly
Day 2, Wednesday, April 12th 12 Noon until 6:00 PM
Stage 3 -- Fuselage Trimming and support, Cockpit module assembly, Flying
control installation and alignment, Spar bushing alignment and installation
Pitch torque tube, Fuel tank assembly and installation, Bonding
module to fuselage bottom, Rear tail bulkhead, Torque tube alignment and
installation,
Pitch control system, Landing Gear mounting frame, Rudder pedals and control
system, Tailwheel spring and Sternpost, & Fuselage top molding prep and
installation
Day 3, Thursday, April 13th 12 Noon until 6:00 PM
Final assemblies -- Wing lift and drag pin/socket installation and
alignment, Wing to fuselage alignment, Drag pin cross tube installation,
Flap control system,
Main landing gear (mono and tri), Fuel system, Firewall (metal and molded),
Door assembly and alignment, & Windshield installation
Stage 4 -- Rotax engine alignment and installation, Radiators, baffles and
hoses, & cowl installation
$$$$ YOUR COST $$$$$
$100.00 per day (you may elect to attend any of the days or all of them)
$25.00 registration fee
Space is limited
CONTACT:
Russell Lepre'
RLaviation@aol.com
(813) 690 - 1916
|