Hi All,
Just back from another build session on my XS trigear.
Forgive me but I simply have an irresistable urge to vent
my frustration.
It seems with the current plans that securing the tie bar with
the 5 bolts through the plates and W35 is needlessly frustrating and
difficult in the trgear with those landing leg ribs in place, even
though I had pretrimmed the shape of the rib going to that corner before
glassing it in. Getting the nuts on is more than a simple pain! Further,
the apex of W35 really should have been chamferred to avoid bubbles. A
figure in the manual of the structure in situ would have help plan these
things in advance!
Flame off.
Cheers,
Ira
A224
|