Ron,
The easiest way to get a direct response from John is at europa@gate.net
I was in the Airmaster factory yesterday and the lead time is running at
around 4 weeks.
Tony
-----Original Message-----
From: Ronald J. Parigoris
Cc:=09
Subject: Europa-List: Current list of things needed
<rparigor@suffolk.lib.ny.us>
Hello John
Here is a current list of things needed.
The Elevator assembly is on bench assembled awaiting stuff to complete
it. ASAP
on parts needed.
The angle of incidence is off from 1 side of elevator to other beyond
what
Neville feels is OK to leave. Going to have to probably go after drive
bushings
to make it right.
We are looking forward to getting elevator and Torque Tube behind us.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~
Workin on reinforcing the wings. Fun stuff, feels like final getting
somewhere,
not like 1 step forward, 3 steps back on Accelerated Elevator "MANY"
Problems.
Boy, if you ever have any customers getting the "Ground Drag Blues" on
building,
send em over to the 2 inch wing reinforcement step. It is a real Pick Ya
Up.
Have needed primers and top coat paint, in near future will paint all
inside and
out wing hardware and hang flaps and ailerons. Just got in Plexiglas for
wing
bottom inspection covers.
Then it is on to make Fuse Cradle.
Going to wait till last minute to bond on top wing skin and fuse top.
Will order
redux when close bonding.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~
How much lead time you need on firewall forward 914 with CS Airmaster?
At what point in build you think it is a good place to place order on
Firewall
Forward?
Ron Parigoris