Paul Stewart a crit :
>
> Wee took delivery of our 914 about 2 1/2 years ago. We are still a
> long way from flying or even commissioning the engine. I know the
> engines come prepared for storage but is there a time limit before we
> should be doing anything other than look longingly at it?
>
>
Paul,
You may want to open the crate and read your Installation Manual, page
22-23. They say someting has to be done after a 12 month storage period.
But in my opinion, you better leave it alone and not open it before your
are ready for installation, provided you stored it in a dry place.
We too took a long time before installing the engine.
Regards,
Gilles Thesee
Grenoble, France
http://contrails.free.fr
|