| Subject: | Re: Europa-List: Drilling the Control Column Bottom Fitting |
|---|---|
| From: | Fred Fillinger <n3eu@comcast.net> |
| Date: | Sat, 28 Aug 2004 20:39:50 |
Tony Renshaw wrote: > Gidday, > I am wondering how I am going to get my control stick wiring past the pivot > bolt that supports the Control Column Bottom Fitting? You may wish to consider the gauge wiring you are using. I can't think of any function wired to a device at the top of the stick that requires anything larger than even #30 for intermittent use, although #24-26 may be more workable wherever it terminates. You can buy multi-conductor cable with whatever gauge desired, with sleeving for additional chafe protection, from online electronics surplus houses. Reg, Fred F. |
| <Prev in Thread] | Current Thread | [Next in Thread> |
|---|---|---|
| ||
| Previous by Date: | Re: Europa-List: Drilling the Control Column Bottom Fitting, Rocketman |
|---|---|
| Next by Date: | RE: Europa-List: Drilling the Control Column Bottom Fitting, Robert Berube |
| Previous by Thread: | Re: Europa-List: Drilling the Control Column Bottom Fitting, Rocketman |
| Next by Thread: | RE: Europa-List: Drilling the Control Column Bottom Fitting, Robert Berube |
| Indexes: | [Date] [Thread] [Top] [All Lists] |