Hi Bob,
Can you tell me if the axles are for 500 series wheels please, and do
they have provision for spats, standard??
Regards
Tony Renshaw
On 26 May 2014, at 12:03 pm, Robert Borger <rlborger@mac.com> wrote:
> Kevin,
>
> Check my site at EuropaOwners.org. On the main page (
http://www.europaowners.org/main.php?g2_itemId=60232 ) there=92s an
album in the upper right corner titled Tri-Gear Conversion. It has a
fairly complete pictorial documentation of the work at Bud=92s shop. Go
slow, take your time, it=92s a worthwhile conversion to reduce the
personal stress of landing to just about zero.
>
> Blue skies & tailwinds,
> Bob Borger
> Europa XS Tri, Rotax 914, Airmaster C/S Prop (50 hrs).
> Little Toot Sport Biplane, Lycoming Thunderbolt AEIO-320 EXP
> 3705 Lynchburg Dr.
> Corinth, TX 76208-5331
> Cel: 817-992-1117
> rlborger@mac.com
>
>
> On May 25, 2014, at 6:26 PM, Bud Yerly <budyerly@msn.com> wrote:
>
> Kevin,
>
> I normally do the first layup with a single dry ply and dart the
corners as in any proper layup technique. I prefer not to see my
clients make tapes as it tends to make for more voids and sticky messes
when it goes a bit wrong. The uni is applied to the inside of the bay
after the bid. During the layup of the dry glass procedure, the sticky
initial layer and flox makes placement of the white glass in the dark
hole and cutting and darting easier for me. Good sharp shears are
essential. In the dry glass layup, you will use more epoxy as gravity
works 24/7 so simply peel ply and mop up the excess when done and let it
cure. Use just a bit of denatured alcohol if the puddle is getting
sticky. Remember to leave a tab to pull the peel ply by.
>
> Go slow, take your time on getting your ply pieces fit well. My
clients have me do the cuts as I am faster, but don't trust the manual
cutouts, make a template from cardboard and fit it in place. Be sure to
leave working room around the mod 52 tube and socket. You will find
that the dry glass layups can go fairly fast, but with the top on it is
a real back breaker. Get yourself some good cool running LED lights for
good visibility (incandescent bulbs make it a very hot job in Florida
and the glue kicks very fast) . A small 4 by 4 inch mirror is essential
to check for voids and dry bid. In places it is necessary to cut the
handle of the brush down and round it off so it doesn't snag anything to
get in those corners well.
>
> It is nice to have one person glassing one side, and I on the other,
with a helper mixing 100gram cups of epoxy as we go. I've done the
project in 4 days but prefer 7.
>
> My back can't take it so I do the inner and outer initial
reinforcements on day 1.
> Day 2 I do the final line up of the tubes and gear and check
everything absolutely right and the aircraft jigged dead solid. Redux
in the tubes.
> Day 3 I install the first rib and allow to firm up then lay glass over
it and allow to cure. (With the top on it may be best to set the rib,
peel ply and allow to cure. Glass the next day.
> Day 4 is Rib 2 unless I work a long Day 3 and install rib two over
tacky glass and bond in both in one day. You gotta be quick and good
for that and have a kit with the top off.
> Day 5 are Rib 3 and 4
> Day 6 grind the tops and clean up, then apply uni. You can pop the
gear and finish up or...
> Day 7 Pop out the gear, finish the outside layups, and reinstall the
gear, pull the fuselage from the jig and put on the brakes and wheels...
>
> Working alone, make it a half a day for 14 days and save your back and
make it a more enjoyable easily paced project...
>
> Bob Borger posted how I do my jig setup in my shop, and if memory
serves, it took a full two weeks to pull the gear, clean up and put in
the tri-gear, we mounted hand brake cylinders in the tunnel per my
standard and closed up the belly with new firewall with 4 of us working.
>
> Regards,
> Bud Yerly
> CFC, Inc.
>
>
>
> > Subject: Europa-List: Landing Gear Layups in Baggage Bay
> > From: kelv@kdweston.biz
> > Date: Sun, 25 May 2014 02:34:23 -0700
> > To: europa-list@matronics.com
> >
<kelv@kdweston.biz>
> >
> > Hi All,
> >
> > I know this has been discussed before but I am just preparing the
baggage bay for the landing gear reinforcement layups and have a few
questions for those that have gone before me and successfully completed
this mega task.
> >
> > The manual states =93 layup 2 plies of bid over the entire
area of the baggage bay up to the level of the top of the centre tunnel.
> >
> > a) Is this best done in one piece of bid? The manual does not state
any preference. What have others done?
> >
> > b) If done in one piece of bid, is it okay to cut the corner folds
and overlap? This would certainly make for a simpler and neater
installation and would also increase the number of layers in the
corners. Surely a good thing?
> >
> > I intend to layup the bid on plastic, my normal method for easier
handling, before attempting to introduce to the baggage bay.
> >
> > Next, the manual states - add 2 plies of uni, to the same height,
onto the baggage bay rear bulkhead from the sidewall to the central
tunnel, with the fibres running spanwise.
> >
> > c) I am assuming this is just on the inner aft side of the baggage
bay box?
> > Also, there is no mention of any overlap onto the floor, sides or
centre tunnel, so just into the corners then?
> >
> > Interested to hear what others have done for this part of the build
and what is considered best practice for this layup.
> >
> > The fuselage top is still off so slightly easier but the back
support belt and pain relief cream are standing by!
> >
> > Many thanks.
> >
> > --------
> > Regards
> >
> > Kelv Weston
> > Kit 497
> > kelv@kdweston.biz
> >
> >
> >
> >
> > Read this topic online here:
> >
> > http://forums.matronics.com/viewtopic.php?p=423762#423762
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
>
>
>
>
href="http://www.matronics.com/Navigator?Europa-List">http://www.matroni
cs.com/Navigator?Europa-List
> href="http://forums.matronics.com/">http://forums.matronics.com
>
href="http://www.matronics.com/contribution">http://www.matronics.com/co
ntribution
>
>
|