| Subject: | Re: Baggage bay bulkhead to fuselage | 
|---|---|
| From: | Graham Singleton <grasingleton@avnet.co.uk> | 
| Date: | Wed, 20 Nov 2002 00:53:57 | 
| calpath.net> >The manual says to apply two ply BID 1" onto the baggage bay bulkhead and >inside >of the fuselage top. > >Two observations surface. 1) That bulkhead is somewhat flimsy and 2) only 1" >bonding surface of the BID tape suggests that the bond is not really >intended to >be structural. It is structural. A 1"flange adds a lot of stiffness. >Question: Should there be BID applied to both sides of the bulkhead, or >only to >the forward side? Yes. Both sides. Graham | 